top of page
Gemini_Generated_Image_74qfbh74qfbh74qf.jpg

Welcome to PACE 

Infrastructure Delivery Professionals. Battle-tested in rail's toughest programmes. Now powered by Aikido's intelligence.

PACE deliver project and programme management for Britain's most complex rail and infrastructure schemes — enhanced by the Aikido Intelligent Control Platform for real-time visibility, automated reporting, and multi-stakeholder assurance.

Why Choose PACE as your Project partner

Expert teams driving confident proven project delivery

Proven Rail Expertise

25+ years delivering complex rail and infrastructure programmes with confidence and precision.

Intelligent Programme Control

Aikido provides real-time visibility, reporting and governance across programmes.

Delivery Focused

Practical expertise focused on better outcomes for complex programmes.

ABOUT AIKIDO 

Centralised, accessible integrated Project Management, controls and reporting.

One platform, one source of truth. A truly integrated system reading from source data and core applications bringing all the data into a common data environment, providing assurance and insights 

Aikido brings large volumes of fragmented programme data into one visually engaging and clear view — so rail and infrastructure teams can stop chasing spreadsheets and start delivering with confidence.

AI-powered analysis surfaces risks, runs predictive analysis, highlights unacceptable variances, and helps your teams focus where it counts.

Aikido_image_edited.jpg
footer-bg.jpg

WHAT WE DO

Expertise That Moves Complex Programmes Forward

02_digital_twin_station.png
Integrated Project Delivery

Delivering multi-disciplinary projects and programmes from concept through to commissioning.

05_engineer_tablet2.png
Complex Scheme Deep Dive / Peer Reviews

Structured reviews of programme setup, controls, reporting and governance — identifying gaps and recommending corrective actions.

03_command_centre2.png
PACE Control Tower Operations

Controlling mind and stakeholder interface management needed to maintain programme-wide visibility and control.

02_data_to_clarity.png
Data Management & Visualisation

Turning programme data into clear intelligence through data management, visualisation, tracking and reporting.

04_data_streams_tracks2.png
Project Management & Engineering Consultancy

Quality-assured project management and engineering consultancy for complex rail schemes.

12_construction_simulation.png
Visualisation & Real-Time Simulation

Innovation and proven results through 4D planning, visualisation and real-time simulation.

 

13_footer_band_wide_2560x717.png

AIKIDO ICP BANNER

Intelligent Control for Complex Programme Delivery

Aikido ICP brings project delivery, reporting and governance into one intelligent platform — giving complex programmes real-time visibility, automated reporting and controlled access across multiple stakeholders.

CASE STUDIES

Proven Delivery. Real-World Results.

From Concept to Rail Awards at the UK's busiest Station

A scheme that had become unaffordable due to the escalating scheme cost, was in delay, did not have a compliant engineering solution and had lost stakeholder confidence.

Reimagining the delivery methodology and delivering the reality of a seamless major infrastructure project implementation. Also our first deployment of Aikido

Key results:
33 months programme reduction
Significant cost savings

No negative station or operations impact

Aikido created significant project saving and delivery efficiencies. 

Norwich, Yarmouth & Lowestoft Electrologix re-signalling. 

Electrologix was the new signalling interlocking with its first major 38-mile installation on the NYL route, part of the full system upgrade with a full rolling stock replacement. The scheme had gone into delay and had escalating cost. Greater Anglia had lost confidence and the railway access strategy could not be agreed. 

Key results:
Delivery to plan of a re-baselined programme

Long term access strategy plan agreed with significant reduction in required access.  

Controlling mind and delivery of route wide 21-day blockade day blockade

Gospel Oak to Barking electrification - Scheme recovery to full Authorisation

One of the most politically pressured Network Rail electrification schemes had gone into significant delay. The Transport for London Overground trains were being delivered and had to go into service to meet the new UK timetable

 

Key results:

Full programme stabilisation 
Delivered to the agreed recovery plan, electrifying the infrastructure within 12 month 

One of the first major electrification schemes to go through the full CSM  Authorisation process

CONTACT

Ready to Take Control of Your Programme?

Contact

+44 (0)7876 202004

Email
Do you want an Aikido Demo?
Multi-line address
bottom of page